co-location

The practice of placing power-hungry facilities, like data centers, directly adjacent to a power generation plant to bypass the public grid.

Co-location in the energy sector refers to placing high-demand industrial facilities—most notably AI and hyperscale data centers—directly on the site of a power generation plant, such as a nuclear, natural gas, or large-scale renewable facility. This physical proximity allows the industrial facility to draw electricity directly from the generator "behind-the-meter," bypassing the public transmission grid. This strategy has become highly valuable for technology companies because it allows them to bypass the lengthy queues and regulatory hurdles associated with connecting to the public transmission grid. It also reduces transmission line losses and grid congestion fees, securing a reliable and often zero-carbon source of baseload power much faster than traditional grid-interconnection pathways. For utility and independent power producer (IPP) investors, co-location agreements can unlock premium pricing for power assets and provide steady, long-term cash flows. However, these arrangements attract significant regulatory scrutiny from grid operators and consumer advocates who worry that diverting power directly to private facilities could reduce overall grid reliability or increase costs for everyday retail ratepayers.

A technology company builds a data center next to a nuclear plant and signs a co-location agreement to buy 300 megawatts (MW) of power directly from the generator at $70 per megawatt-hour (MWh). If the market price for power on the public grid is $50/MWh, the power producer earns a premium of $70 - $50 = $20/MWh, while the tech company avoids waiting 5 years for a standard grid connection.